Skip to main contentSkip to footer
Slide 1 of 5

Overview

DIY Kits 150W 10A Battery Capacity Tester Adjustable Constant Current Electronic Load Discharge Test

DIY Kits 150W 10A Battery Capacity Tester Adjustable Constant Current Electronic Load Discharge Test

Model: 4791498075170
Web Code: 20175487
Sold and shipped by | 2.7 seller rating (9 reviews)

Sale ends: *

Available for deliveryAvailable online only

Delivery times vary by location. Most Marketplace items leave sellers' locations within 2 business days. Allow additional time for shipping.

Enjoy on orders from this seller.

Seller Return Policy

Read return policy

Warranty Information

Check with the manufacturer for details.

For Quebec residents: See the Availability Guarantee disclosure in the Specifications section below.

The voltage is the range of the power supply voltage value and cannot be adjusted.

The current is adjustable for this load test. After adjusting the desired value, test with constant current.

Test the maximum discharge current of the power supply, check whether the power supply current is real, and use the power product aging test.

Remarks: How many W are all in the power dissipation of the NMOS tube, and the board voltage is within 300V. You can also increase the power in parallel with multiple blocks.

The basic circuit form is that TL431 provides reference voltage, sense resistor, LM324 operational amplifier error amplification,Together with the MOS tube, it forms a constant current circuit. Use 4 MOS tubes with CPU heat sink.Substitution: Model 80NF70 IRF3205 HRF3250 IRF1010 IRF2807IRF1405 047an08ao, etc., also available for TO-247 high-power packaging tubes such as IRF 250 260.When the board is powered by a 12V switching power supply, the wire can be soldered to the right + -.

Or solder the DC seat and use 2 wires to short-circuit the +- solder joint. The 4 rectifier tubes can be welded! ! !

The heat sink cannot be connected to the negative metal of the 12V DC seat, and the two cannot be connected to the metal shell at the same time! !

When the board is connected to the digital dual display meter, the power supply of the meter header is connected with the small red line on the left end of the board: +12V

Note: Do not connect the thin black wire to GND! (It will be inaccurate if the current is connected)! ! !

A+-the current thick red and black wire connected to the meter head V+ is connected to the thin yellow wire voltage test of the meter head, IN is the test input terminal, and the red and black test terminal is connected to the power supply under test. The FAN terminal is connected to the cooling fan.

Openthe cap of the knob and tighten the screw.

The power tube is coated with thermal grease and screwed directly to the heat sink, and the heat sink must be co

For Quebec residents – Disclosure under the Consumer Protection Act

In compliance with Bill 29, Best Buy and third-party sellers on Best Buy Marketplace do not guarantee the availability of replacement parts, repair services, or maintenance information for any products. Coverage provided through any Best Buy Protection programs and applicable manufacturer warranties, if any, remain in place. Please contact the manufacturer directly for information about their availability guarantee.

Shipping Charges

Free standard shipping on all orders.

Processing Time

Most items ship within 2 business days after an order is placed*. Allow additional time for shipping to your address.
*Please note: If an item you ordered becomes unavailable, you'll be notified and a full refund will be processed within 2 business days.

Shipping Area Restrictions

Shipping is not available in the following areas*:
  • No restrictions in Canada
*Please note: Shipping area restrictions may vary for large items. If an item can't be shipped to your address, we'll let you know during the checkout process.
See our return policy to find specific return information for this product and steps on how to return by mail.