Skip to main contentSkip to footer
Slide 1 of 5

Overview

Waterproof Dog Recall Leash Long Training Lead for Small Medium Large Dogs 20m Orange 1 Piece

Dog Training Leash Waterproof Long Lead with Comfortable Handle Orange 20m 1 Piece

Model: JIEYARA-788
Web Code: 19934358
Sold and shipped by | 3.0 seller rating (99 reviews)

Available for deliveryAvailable online only

Delivery times vary by location. Most Marketplace items leave sellers' locations within 2 business days. Allow additional time for shipping.

Enjoy on orders from this seller.

Seller Return Policy

Read return policy

Warranty Information

Check with the manufacturer for details.

For Quebec residents: See the Availability Guarantee disclosure in the Specifications section below.

1. Technical specifications: This lanyard is 20 meters long with a tensile strength of 200 kg. It combines a robust polyester inner layer and a waterproof PVC outer coating for maximum durability.

2. Compatibility and accessories: Designed for small, medium and large dogs, this leash fits all standard collars thanks to its 360-degree swivel metal snap hook which prevents twisting.

3. Installation and Use: No complicated installation is required. Simply clip the locking hook onto the collar. The generous length allows you to train your pet while letting them freely explore nature.

4. Other information: The smooth PVC surface prevents dirt buildup and makes cleaning with soapy water easy. After washing, the leash dries quickly without retaining unpleasant odors.

5. Important Notes: Bright colors improve visibility in the forest. Please note that slight variations in color may exist between the actual product and the images depending on the lighting.

For Quebec residents – Disclosure under the Consumer Protection Act

In compliance with Bill 29, Best Buy and third-party sellers on Best Buy Marketplace do not guarantee the availability of replacement parts, repair services, or maintenance information for any products. Coverage provided through any Best Buy Protection programs and applicable manufacturer warranties, if any, remain in place. Please contact the manufacturer directly for information about their availability guarantee.

Shipping Charges

Free standard shipping on all orders.

Processing Time

Most items ship within 2 business days after an order is placed*. Allow additional time for shipping to your address.
*Please note: If an item you ordered becomes unavailable, you'll be notified and a full refund will be processed within 2 business days.

Shipping Area Restrictions

Shipping is not available in the following areas*:
  • No restrictions in Canada
*Please note: Shipping area restrictions may vary for large items. If an item can't be shipped to your address, we'll let you know during the checkout process.
See our return policy to find specific return information for this product and steps on how to return by mail.