Skip to main contentSkip to footer
Slide 1 of 5

Overview

Waterproof Dog Leash Heavy Duty Training Lead for Dogs Orange 10 m 1 Piece

Dog Training Leash Waterproof Long Lead with Locking Snap Hook for Small Medium and Large Dogs Orange 10 m 1 Piece

Model: JIEYARA-944
Web Code: 19934273
Sold and shipped by | 3.0 seller rating (99 reviews)

Available for deliveryAvailable online only

Delivery times vary by location. Most Marketplace items leave sellers' locations within 2 business days. Allow additional time for shipping.

Enjoy on orders from this seller.

Seller Return Policy

Read return policy

Warranty Information

Check with the manufacturer for details.

For Quebec residents: See the Availability Guarantee disclosure in the Specifications section below.

【10m Heavy-Duty Waterproof Dog Leash】The inner layer of this dog leash is made of polyester, and the outer layer is waterproof PVC. This construction ensures the leash is highly durable and waterproof. With our waterproof leash, dogs can play or swim freely in lakes, the sea, and marshes. They can also run freely in the snow. The dog leash does not absorb water and remains lightweight.

【Upgraded Locking Hook】Our beautiful bone-shaped metal carabiner is praised by pet owners worldwide. This is because it not only withstands a tensile force of 200 kg but also features an additional locking mechanism. The locking design prevents your dog from accidentally opening the carabiner and escaping. The carabiner can rotate 360°, allowing your dog to sniff freely.

【Weatherproof and Easy to Maintain】You don't need to check the weather forecast when walking your dog. This dog leash can be used in all weather conditions, whether sunny or stormy. It's easy to clean after use; simply rinse it with water or soapy water. After washing, it dries quickly and is odor-free. The smooth surface of the PVC dog leash doesn't trap dirt.

Sturdy stitching and a comfortable wrist strap: all leash connections are securely machine-stitched. The leash is made of PVC and soft SBR fabric, which is pleasant to the touch and won't scratch your palm when your dog runs frantically. The bright colors of the hiking leash are eye-catching and make it easier to keep track of your dog.

Perfect for training and everyday life: Our 10m long training leash without elastic cord is better suited for training and education, giving you greater control over your dog. Our 10m leash gives your dog more freedom to run, walk, and play in forests, lakes, meadows, and gardens.

For Quebec residents – Disclosure under the Consumer Protection Act

In compliance with Bill 29, Best Buy and third-party sellers on Best Buy Marketplace do not guarantee the availability of replacement parts, repair services, or maintenance information for any products. Coverage provided through any Best Buy Protection programs and applicable manufacturer warranties, if any, remain in place. Please contact the manufacturer directly for information about their availability guarantee.

Shipping Charges

Free standard shipping on all orders.

Processing Time

Most items ship within 2 business days after an order is placed*. Allow additional time for shipping to your address.
*Please note: If an item you ordered becomes unavailable, you'll be notified and a full refund will be processed within 2 business days.

Shipping Area Restrictions

Shipping is not available in the following areas*:
  • No restrictions in Canada
*Please note: Shipping area restrictions may vary for large items. If an item can't be shipped to your address, we'll let you know during the checkout process.
See our return policy to find specific return information for this product and steps on how to return by mail.